Introduction
One utility contractor recently saved an average of $430 per job over 14 projects by switching to Quick Mix Concrete’s Pay for What You Use pricing model. That added up to more than $6,000 in total savings — and over 27 yards of wasted concrete avoided. Here’s how it happened, and how you could save too.
The Real Cost of Concrete Mis-Orders
Ordering concrete is always a guessing game. Get it wrong, and the costs pile up fast:
- Order too much → you’re paying for material that never gets used.
- Order too little → your crew is stuck waiting on a second delivery, costing extra time and labor.
These mis-orders eat away at profit margins. That’s why Quick Mix Concrete built a better solution.
What Makes Quick Mix Concrete Different?
Most ready-mix suppliers make you pay for the entire load you order — whether you use it or not.
At Quick Mix Concrete, our approach is simple:
👉 You only pay for what you use.
That means:
- No wasted material from over-orders
- No stress about under-ordering
- No money lost from mis-orders
The Real Numbers: $430 Saved Per Job
Here’s a real example. Over the course of 14 projects, one utility contractor:
- Saved an average of $430 per job
- Eliminated 27 yards of wasted material
- Kept more than $6,000 total in their budget
That’s thousands saved simply by avoiding mis-orders.
Why Utility Contractors Love It
Utility contractors face tight deadlines and budgets every single day. With Quick Mix Concrete, they:
- Get the exact amount needed every time
- Bid projects more accurately, knowing waste is reduced
- Avoid downtime caused by under-ordering
- See instant cost savings on every pour
How “Pay for What You Use” Works
The process couldn’t be simpler:
- Place your order – Tell us what you think you’ll need.
- On-site mixing – We mix fresh concrete on-site, to the exact requirement.
- Pay only for what’s poured – If you thought you’d need 9 yards but used 7.75, you only pay for 7.75.
No mis-orders. No wasted dollars.
Saving Beyond Dollars: Efficiency & Sustainability
This isn’t just about saving $430 per job. Avoiding mis-orders also means:
- Lower hauling and disposal costs
- Improved sustainability with less waste
- Crews that stay on schedule
It’s efficiency that pays off long after the pour is done.
Ready to Save on Your Jobs Too?
If you’re already a contractor working with Quick Mix Concrete, you know the savings firsthand. But if you don’t yet have access to contractor pricing, now’s the time to get it.
📌 Request Contractor Pricing Today → Click here to apply
Getting set up is quick, easy, and puts you on the path to:
- Lower material costs
- Smarter bidding
- More profitable jobs
FAQs
Q: Do I have to order in full truckloads?
No — we mix on-site, so you can order exactly what you need.
Q: How is the pricing calculated?
You’re billed for the actual cubic yards poured — down to the decimal.
Q: Can this work for small jobs?
Absolutely. Even if you need just 1 yard, you only pay for 1 yard.
Q: Is the concrete still high quality?
Yes. It’s fresh-mixed on demand, ensuring consistency and strength.
Wrapping It Up
This isn’t just about one contractor’s $6,000 in savings — it’s about eliminating costly mis-orders once and for all.
With Quick Mix Concrete, contractors save an average of $430 per job by only paying for what they use. That means no wasted material, no surprise costs, and no more guessing games.